In the Grand Sud Logistique area in Montbartier (82), an independent logistics building to be built class A of 37,800m2, divisible from approximately 17,000m2.
It is composed of 4 warehouse cells, offices and social premises and 2 loading premises.
ICPE 1510, 1530, 2662, 2663.
In the immediate vicinity of the A62 and the A20.
- Department
- Tarn-et-Garonne
- Access
- A62
A20
ground floor
- activity/warehouse
- 16,000 sqm
- offices/social premises
- 800 sqm
- technical rooms
- 100 sqm
- charging room
- 200 sqm
- Total area
- 17,100 sqm
- Divisible from
- 5,000 sqm
- Independent building
- yes
- General condition
- to be built
- Availability
- 12 months after agreement
Single-sided warehouse
Divisible from 5,000 m²
- Type of construction
- concrete structure
- Height
- 11 m
- Floor load
- 5 t/sqm
- Coverage
- insulated steel tray multi-layer waterproofing
- Roof insulation
- Wall insulation
- insulated double skin cladding
- Level access
- Dockside access
- 15
truck yard: 35 metres
5 trucks and 170 cars for the building
- Parking spaces
- 80 LCV / HGV : Yes
- Sprinkler
- Hose station
- Heavy traffic
- 1510
- Storage of combustible materials, products or substances in covered warehouses
- 2925
- Battery charging workshops
- Global rent before tax/sqm/year
- 59 €
- Tax regime
- VAT
- Lease
- 6.9
- Warranty deposit
- 3 months rent excl.
- Method of payment
- quarterly in advance
- Property taxes
- at the expense of the lessee
- Agent's fees (to be paid by the lessee)
- contact us
Rent: 63 €/m²/year including 6 € for the installation of a low-carbon photovoltaic boiler system allowing approximately 50% self-consumption
- Rental costs
- 3.5 €/sqm
- Property tax
- 2.5 €/sqm
Guy FRANCEZ
- +33 (0)5 56 11 77 19
- gfrancez@eol.fr