In the Grenoble airport area, not far from the A48, a logistics warehouse to be built, divisible into two 6000m² lots.
The building will include a photovoltaic power plant coupled with storage batteries to make the site energy self-sufficient.
- Department
- Isère
- Zone
- ZAC GRENOBLE AIR PARC
- Access
- A48, D119
- Road access
- Road access: D119, A48, A7, A49
SNCF : Beaucroissant station
ground floor
- activity/warehouse
- 11,801 sqm
- offices/social premises
- 312 sqm
- technical rooms
- 100 sqm
- charging room
- 300 sqm
- Total area
- 12,513 sqm
- Divisible from
- 6,000 sqm
- Independent building
- yes
- General condition
- to be built
- Availability
- 12 months after agreement
- Type of construction
- concrete structure
- Height
- 11 m
- Coverage
- double-skinned insulated steel tank
- Roof insulation
- Wall insulation
- insulated double skin cladding
- Level access
- 1
- Dockside access
- 12
- Heating source
- electricity
- Type of heating
- unit heater
- Type of lighting
- LED
BREEAM VERY GOOD certification
- Parking spaces
- 70 LCV / 5 HGV
- Sprinkler
- Hose station
- Alarm
- Heavy traffic
Home
Lobby
Layout
Open space + partitioned offices
- 1510
- Storage of combustible materials, products or substances in covered warehouses
- 2925
- Battery charging workshops
- Global rent before tax/sqm/year
- 65 €
- Tax regime
- VAT
- Lease
- 6.9.12
- Warranty deposit
- 3 months rent excl.
- Method of payment
- quarterly in advance
- Property taxes
- at the expense of the lessee
- Agent's fees (to be paid by the lessee)
- contact us
- Rental costs
- 3.5 €/sqm
- Consumption
- 2 €/sqm
- Property tax
- 2.32 €/sqm
Energy self-sufficient building through the installation of a photovoltaic plant coupled with storage batteries. Additional costs of ?4/m²/year cancelled out by the energy savings achieved.
Benjamin SELLIER
- +33 (0)4 28 29 01 28
- bsellier@eol.fr