HARNES (62) : project of a logistic platform of 20 812 m². Near A1 and A21. PC and ICPE obtained.
- Department
- Pas-de-Calais
- Zone
- ZI LA MOTTE DU BOIS
- Road access
- A1 and A21 at 5 km by road
ground floor
- activity/warehouse
- 9,819 sqm
1st floor
- offices/social premises
- 618 sqm
- Total area
- 10,437 sqm
- Divisible from
- 5,000 sqm
- Independent building
- yes
- General condition
- new
- Date of construction
- 2023
- Availability
- available now
Cell frame: D105 x W47
Targeted certification Breeam Very Good
- Type of construction
- concrete structure
- Height
- 11.6 m
- Floor load
- 5 t/sqm
- Level access
- 1
- Dockside access
- 10
- Heating source
- gaz
- Type of lighting
- zenithal by sky domes
Truck yard 38 m
- Parking spaces
- 61 LCV / 6 HGV
- Sprinkler
- Hose station
- Heavy traffic
Heating
Gas boiler and hot water unit heaters (12° for +5° outside)
- 1510
- Storage of combustible materials, products or substances in covered warehouses
- 1530
- Deposits of paper, cardboard or similar combustible materials
- 1532
- Storage of wood or similar combustible materials
- 2662
- Polymer storage
- 2663
- Storage of tyres and products composed of at least 50% polymers
- Global rent before tax/year
- contact us
- Global rent before tax/sqm/year
- contact us
- Tax regime
- VAT
- Lease
- 6.9
- Warranty deposit
- 3 months rent excl.
- Method of payment
- quarterly in advance
- Property taxes
- at the expense of the lessee
- Agent's fees (to be paid by the lessee)
- contact us
- Rental costs
- 3.92 €/sqm
- Building insurance
- 0.6 €/sqm
- Consumption
- 3.17 €/sqm
Property tax in the process of being determined
- 62 087 414L
- 10,376 sqm
- 62 087 416L
- 20,813 sqm
- Total area available
- 20,813 sqm
Enguerrand COUSYN
- +33 (0)3 20 40 00 00
- ecousyn@eol.fr
pending